It's not like nothing is going on, it's just not very visual. Still, in the interest of keeping the site current--look, wires! The electrician should be finishing up this week, and then we'll have a dozen inspectors in to check everything out.

We're doing a lot of recessed lighting on the first two floors.
The plumbers have been scurrying around too. Here's the walk in shower. Two shower heads, no waiting.

These are the mysterious pipes and wires and ducts that are snaking throughout the attic. No idea what they're for, I only know they're screwing up my storage space. Oh well.

HOME